Transform for Draft Tube of Unit 2 in the Third Power Station of Gutianxi Hydropower Plant
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper introduces the improvement project for draft tube of Unit 2 in the third power station of Gutianxi Hydropower Plant, it includes: the partial reconstruction of draft tube, renewal of draft tube manhole door, the base of draft tube Grouting.

    Reference
    Related
    Cited by
Get Citation

Tong DuiLong. Transform for Draft Tube of Unit 2 in the Third Power Station of Gutianxi Hydropower Plant[J]. Journal of Integration Technology,2013,2(1):66-69

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 18,2013
  • Published:
Article QR Code