This paper introduces the improvement project for draft tube of Unit 2 in the third power station of Gutianxi Hydropower Plant, it includes: the partial reconstruction of draft tube, renewal of draft tube manhole door, the base of draft tube Grouting.
Citing format Tong DuiLong. Transform for Draft Tube of Unit 2 in the Third Power Station of Gutianxi Hydropower Plant[J]. Journal of Integration Technology,2013,2(1):66-69